I want to have this quilt ready for hand sticking of the binding (which is the last step) no later than July 30. That is exactly 9 days away. So here is the plan...
Wed, July 21
1. Finish cutting all purple fabric.
2. Assemble siggy blocks and iron them.
Thurs, July 22
1. Iron and cut yellow fabric squares and border.
2. Lay out all blocks on design wall.
Fri, July 23
1. Begin assembling blocks to form quilt top.
Sat, July 24 and Sun, July 25
1. Finishing assembling blocks to form quilt top.
Mon, July 26
1. Add borders to quilt blocks thereby completing the quilt top.
2. Cut and assemble backing.
3. Design quilt label and attach to backing.
Tues, July 27
1. Sandwich quilt top, batting and backing.
2. Baste quilt sandwich.
Wed, July 28
1. Machine quilt the quilt.
Thur, July 29
1. Cut and attach binding.
Fri, July 30
1. Fold over binding using binder clips.
2. Collect quilting notions to take with us to AirVenture 2010 where I intend to hand stick the binding onto the backing.
Sat, July 31 and Sun, Aug 1
1. Hand stick binding.
Mon, Aug 2
1. Wash completed quilt.
Tues, Aug 3
1. MAIL QUILT!